We
build
energy

Engineering · Energy · Infrastructure

We build battery storage, photovoltaics and energy infrastructure – from residential buildings to PV and storage parks, including medium voltage.

Master electrician business based in Pleß in the Unterallgäu district of Bavaria, operating in Germany, Austria and Switzerland.

Battery storage park at dusk: storage containers on the site, an illuminated mini excavator and, in the background, hills with the lights of a village
27years

of experience in solar technology

500+ MWh

of storage capacity installed

100+

medium-sized and large PV systems built

D·A·CH

active in Germany, Austria and Switzerland, based in the Unterallgäu

Crane lifting a battery container onto the foundation of a storage park
01

BESS & EPC

Installation · Integration · Infrastructure

We install battery energy storage systems (BESS) from foundation to grid connection: crane installation, DC and AC cabling, transformer connection and commissioning. Manufacturer-certified, with more than 500 MWh of storage capacity already on the grid.

Rows of PV modules on the flat roof of a commercial building
02

Photo­voltaics

Homes · Commercial · Industrial · Agriculture

PV systems on flat roofs, pitched roofs, façades and barns – for commercial, industrial, agricultural and residential customers. We handle design, installation and commissioning; our team has built more than 100 medium-sized and large systems.

Commercial storage system with two battery cabinets and a charging station on a concrete foundation
03

Energy storage

Commercial storage · Home storage · Charging

Commercial and home battery storage that shaves peak loads, increases self-consumption and powers the EV charging hub – with inverter, meter cabinet and charging station from a single source.

Two transformer stations in front of an industrial building, with an EKRAFT van alongside
04

Grid & infra­structure

Transformer stations · Emergency power · PV canopies

Transformer stations, medium-voltage connections, emergency power systems and cable routes – the infrastructure that connects storage and PV to the grid and keeps operations secure.

Kitchen with indirect ceiling lighting and pendant lights above the worktop
05

Electrical & automation

Electrical installation · Buildings · Loxone

Electrical installation, low-voltage main distribution and building automation. As a Loxone Gold Partner, we design smart home, lighting, access, control and energy management solutions for homes and businesses.

06

Cable routes.
Cost-efficient by design.

BAKS cable support systems · Sales in southern Germany

Cable trays, wire mesh trays, cable ladders and support systems from BAKS, also with circuit integrity E30 to E90 – for electrical contractors, building services engineers and installers.

  1. 1Send your bill of materials – PDF, Excel, GAEB or photo
  2. 2Choose the BAKS alternative
  3. 3Receive a comparison quote

Customer protection: We supply to you and do not approach your client.

Projects

Built and on the grid

Swipe →
Aerial view of several rooftop PV systems in a residential area
Rooftop systemsPhotovoltaics
Commercial storage system with two battery cabinets during commissioning, an excavator in the background
Commercial storageEnergy storage
Data centre building with a green façade, timber cladding and rows of air-conditioning units, an electricity pylon alongside
Infrastructure for a data centreInfrastructure
Illuminated façade of a commercial building at dusk
Façade lightingElectrical
PV modules on the tiled roof of a house, scaffolding in the foreground
HousePhotovoltaics
PV modules on a barn roof overlooking meadows in the Allgäu

For homes and farms

Power from your own roof

PV system, storage and backup power for house and farm. A master electrician business from Pleß near Memmingen designs, installs and remains your point of contact.

  • Photovoltaics for houses, barns and sheds
  • Home battery storage and backup power, for example for the milking robot
  • Smart home and lighting design with Loxone
Florian Schropp carrying out an air-tightness test with a blower door in a battery room

About us

Master electricians from Pleß

EKRAFT GmbH is a master electrician business in Pleß in the Unterallgäu district, near Memmingen. Our team brings 27 years of experience in solar technology and builds in Germany, Austria and Switzerland. We are a Loxone Gold Partner, manufacturer-certified for battery storage and the BAKS sales partner for southern Germany.

Loxone Gold Partner
Two EKRAFT technicians in the battery room between control cabinet, PCS and battery racks

Careers

We build energy. Build with us

Battery storage, PV parks, transformer stations: with us, you work on the energy transition instead of just talking about it. Apply in two minutes, no cover letter needed.

Electrician – energy and building technologyService technicianElectrician apprenticeship

In brief

Frequently asked questions

Where does EKRAFT operate?

We are based in Pleß in the Unterallgäu district. We build battery storage, PV systems and infrastructure in Germany, Austria and Switzerland.

What does EKRAFT take on in a battery storage project?

Installation from foundation to grid connection: crane installation of the containers, DC and AC cabling, transformer connection and commissioning. EKRAFT is manufacturer-certified and has installed more than 500 MWh of storage capacity.

Do you also build PV systems for homes and farms?

Yes. We build photovoltaics for houses, barns and sheds, together with home battery storage and backup power, for example for the milking robot, as well as smart home solutions with Loxone.

How does the comparison quote for cable support systems work?

You send us your bill of materials as a PDF, Excel or GAEB file, or as a photo. We select the right BAKS alternative and send you a comparison quote. We supply to you and do not approach your client.

What certifications does EKRAFT hold?

EKRAFT is a master electrician business, a Loxone Gold Partner, manufacturer-certified for battery storage and the BAKS sales partner for southern Germany.

How quickly will I hear back?

We reply to enquiries sent via the form or by email within one working day.

Your next
project

Reply within one working day

Florian Schropp, Managing Director of EKRAFT GmbH, smiling at a wooden table outdoors
Florian SchroppManaging Director+49 8335 34297-0kontakt@ekraft.energy
Attach plans, a bill of materials or photos – PDF, Excel, GAEB, JPG, up to 20 MB in total

We will get back to you within one working day. We use your details only to process your enquiry; see our privacy policy.

CallEnquiry